Jadwal Kuliah SEMESTER GENAP Tahun Akademik 2025/2026
Hari : Senin
| No | Jam | Ruang | Nama Mata Kuliah | Kelas | Dosen Pengampu |
|---|---|---|---|---|---|
| 1 | 07:00-07:50 | L-401 | Praktikum Simulasi Komputer | B |
Ir. Taufiq Aji, S.T. M.T., IPM.#198709152020121004 (19800715 200604 1 002) |
| 2 | 07:00-08:45 | FST-103 | Pengukuran dan Perancangan Sistem Kerja | A |
Tutik Farihah, S.T. M.Sc. (19800706 200501 2 007) |
| 3 | 07:00-08:45 | L-ERGO | Praktikum Perancangan Teknik Industri | A |
Gunawan Budi Susilo, M.Eng.#198609202019032007 (19860423 201903 1 007) |
| 4 | 07:00-09:30 | FST-300 | Sistem Dinamis dan analisis Kebijakan | A |
Syaeful Arief, S.T., M.T. (19870915 202012 1 004) |
| 5 | 07:55-08:45 | L-401 | Praktikum Simulasi Komputer | A |
Ir. Taufiq Aji, S.T. M.T., IPM.#198709152020121004 (19800715 200604 1 002) |
| 6 | 08:50-10:35 | FST-103 | Pengukuran dan Perancangan Sistem Kerja | B |
Tutik Farihah, S.T. M.Sc. (19800706 200501 2 007) |
| 7 | 08:50-10:35 | FST-306#RAB | Statistika | A |
Ir. Titi Sari, S.T., M.Sc., IPM.#199203312019032015 (19911010 201903 2 032) |
| 8 | 09:45-11:30 | FST-300 | Manajemen Rantai Pasok | B |
Dr. Ir. Yandra Rahadian Perdana, ST., MT#199412072025052005 (19811025 200912 1 002) |
| 9 | 10:40-13:20 | FST-306 | Analisis dan Pengendalian Biaya | A |
Dr. Ir. Ira Setyaningsih, S.T., M.Sc, IPM, ASEAN Eng.#199412072025052005 (19790326 200604 2 002) |
| 10 | 10:40-14:15 | FST-406 | Kalkulus II | A |
Aulia Khifah Futhona, M.Sc. (19920605 201903 2 021) |
| 11 | 12:30-13:20 | L-KIMDAS1 | Praktikum Kimia | C |
Endaruji Sedyadi, M.Sc. (19820205 201503 1 003) |
| 12 | 12:30-14:15 | FST-300 | Metodologi Penelitian | A |
Dr. Ir. Yandra Rahadian Perdana, ST., MT#199203312019032015 (19811025 200912 1 002) |
| 13 | 13:25-14:15 | L-KIMDAS1 | Praktikum Kimia | D |
Endaruji Sedyadi, M.Sc. (19820205 201503 1 003) |
| 14 | 13:25-15:10 | FST-306 | Analitika Data | A |
Muhammad Arief Rochman, S.T., M.T.#199203092020121001 (19820304 200801 1 009) |
| 15 | 14:20-17:15 | FST-300 | Penelitian Operasional Deterministik | G |
Ir. Titi Sari, S.T., M.Sc., IPM.#199412072025052005 (19911010 201903 2 032) |
| 16 | 14:20-17:15 | FST-406 | Manajemen Inovasi | A |
Ir. Trio Yonathan Teja Kusuma, S.T., M.T., IPM. (19890715 201503 1 007) |
Hari : Selasa
| No | Jam | Ruang | Nama Mata Kuliah | Kelas | Dosen Pengampu |
|---|---|---|---|---|---|
| 1 | 07:00-07:50 | L-401 | Praktikum Simulasi Komputer | C |
Ir. Taufiq Aji, S.T. M.T., IPM.#198709152020121004 (19800715 200604 1 002) |
| 2 | 07:00-08:45 | FST-307 | Islam dan Ilmu Sosial dan Humaniora | A |
Muhammad Arief Rochman, S.T., M.T. (19820304 200801 1 009) |
| 3 | 07:00-08:45 | FST-406#RAB | Kimia | A |
Prof. Dr. Maya Rahmayanti, S.Si. M.Si.#198604232019031007 (19810627 200604 2 003) |
| 4 | 07:00-08:45 | L-ERGO | Praktikum Perancangan Teknik Industri | B |
Gunawan Budi Susilo, M.Eng.#198609202019032007 (19860423 201903 1 007) |
| 5 | 08:50-09:40 | L-ERGO | Praktikum Statistika | B |
Ir. Titi Sari, S.T., M.Sc., IPM.#199203312019032015 (19911010 201903 2 032) |
| 6 | 08:50-10:35 | FST-307 | Manajemen Rantai Pasok | A |
Dr. Ir. Yandra Rahadian Perdana, ST., MT#199412072025052005 (19811025 200912 1 002) |
| 7 | 08:50-11:30 | FST-406 | Penelitian Operasional Deterministik | A |
Ir. Titi Sari, S.T., M.Sc., IPM.#199412072025052005 (19911010 201903 2 032) |
| 8 | 09:45-10:35 | L-FISDAS | Praktikum Fisika | B |
Andi, M.Sc. (19870210 201903 1 005) |
| 9 | 10:40-13:20 | FST-306 | Analisis dan Pengendalian Biaya | B |
Dr. Ir. Ira Setyaningsih, S.T., M.Sc, IPM, ASEAN Eng.#199412072025052005 (19790326 200604 2 002) |
| 10 | 10:40-13:20 | FST-307 | Metodologi Penelitian | B |
Dr. Ir. Yandra Rahadian Perdana, ST., MT#199203312019032015 (19811025 200912 1 002) |
| 11 | 12:30-13:20 | L-KIMDAS1 | Praktikum Kimia | E |
Endaruji Sedyadi, M.Sc. (19820205 201503 1 003) |
| 12 | 12:30-14:15 | FST-406#RAB | Kimia | B |
Prof. Dr. Maya Rahmayanti, S.Si. M.Si.#198604232019031007 (19810627 200604 2 003) |
| 13 | 13:25-15:10 | FST-306 | Analitika Data | B |
Muhammad Arief Rochman, S.T., M.T.#199203092020121001 (19820304 200801 1 009) |
| 14 | 13:25-16:20 | FST-307 | Manajemen Perawatan | A |
Ir. Trio Yonathan Teja Kusuma, S.T., M.T., IPM. (19890715 201503 1 007) |
| 15 | 14:20-16:20 | FST-406 | Perancangan dan Pengembangan Produk | G |
Ir. Taufiq Aji, S.T. M.T., IPM. (19800715 200604 1 002) |
Hari : Rabu
| No | Jam | Ruang | Nama Mata Kuliah | Kelas | Dosen Pengampu |
|---|---|---|---|---|---|
| 1 | 07:00-07:50 | L-401 | Praktikum Simulasi Komputer | D |
Ir. Taufiq Aji, S.T. M.T., IPM.#198709152020121004 (19800715 200604 1 002) |
| 2 | 07:00-08:45 | FST-104 | Perancangan Tata Letak Fasilitas | G |
Tutik Farihah, S.T. M.Sc. (19800706 200501 2 007) |
| 3 | 07:00-08:45 | FST-306#RAB | Fisika | A |
Frida Agung Rakhmadi, S.Si., M.Sc.#197710252005011004 (19780510 200501 1 003) |
| 4 | 07:00-08:45 | FST-409 | Simulasi Komputer | A |
Ir. Taufiq Aji, S.T. M.T., IPM.#198709152020121004 (19800715 200604 1 002) |
| 5 | 07:00-08:45 | L-ERGO | Praktikum Perancangan Teknik Industri | C |
Gunawan Budi Susilo, M.Eng.#198609202019032007 (19860423 201903 1 007) |
| 6 | 08:50-09:40 | L-ERGO | Praktikum Statistika | C |
Ir. Titi Sari, S.T., M.Sc., IPM.#199203312019032015 (19911010 201903 2 032) |
| 7 | 08:50-10:35 | FST-104 | Teori Probabilitas | G |
Ir. Khusna Dwijayanti, ST., M.Eng., Ph.D, ASEAN Eng. (19851212 201903 2 018) |
| 8 | 08:50-10:35 | FST-409 | Perilaku Organisasi | B |
Muhammad Arief Rochman, S.T., M.T. (19820304 200801 1 009) |
| 9 | 08:50-11:30 | FST-406 | Perencanaan dan Pengendalian Produksi | A |
Dr. Ir. Yandra Rahadian Perdana, ST., MT#198512122019032018 (19811025 200912 1 002) |
| 10 | 10:40-13:20 | FST-104 | Analisis dan Perancangan Sistem Kerja | G |
Tutik Farihah, S.T. M.Sc. (19800706 200501 2 007) |
| 11 | 10:40-14:15 | FST-306 | Penelitian Operasional Deterministik | B |
Ir. Titi Sari, S.T., M.Sc., IPM.#199412072025052005 (19911010 201903 2 032) |
| 12 | 10:40-14:15 | FST-409 | Analisis Perancangan Perusahaan | B |
Dr. Ir. Ira Setyaningsih, S.T., M.Sc, IPM, ASEAN Eng. (19790326 200604 2 002) |
| 13 | 12:30-13:20 | L-FISDAS | Praktikum Fisika | C |
Andi, M.Sc. (19870210 201903 1 005) |
| 14 | 13:25-15:55 | FST-104 | Pengambilan Keputusan Kriteria Majemuk | A |
Ir. Taufiq Aji, S.T. M.T., IPM. (19800715 200604 1 002) |
| 15 | 14:20-16:00 | FST-409 | Islam dan Ilmu Sosial dan Humaniora | B |
Muhammad Arief Rochman, S.T., M.T. (19820304 200801 1 009) |
| 16 | 14:20-16:20 | FST-306 | Keselamatan dan Kesehatan Kerja | A |
Ir. Trio Yonathan Teja Kusuma, S.T., M.T., IPM.#198609202019032007 (19890715 201503 1 007) |
| 17 | 14:20-16:20 | FST-406 | Menggambar Teknik | G |
Gunawan Budi Susilo, M.Eng. (19860423 201903 1 007) |
Hari : Kamis
| No | Jam | Ruang | Nama Mata Kuliah | Kelas | Dosen Pengampu |
|---|---|---|---|---|---|
| 1 | 07:00-07:50 | L-401 | Praktikum Simulasi Komputer | E |
Ir. Taufiq Aji, S.T. M.T., IPM.#198709152020121004 (19800715 200604 1 002) |
| 2 | 07:00-08:45 | FST-406 | Keselamatan dan Kesehatan Kerja | B |
Ir. Trio Yonathan Teja Kusuma, S.T., M.T., IPM.#198609202019032007 (19890715 201503 1 007) |
| 3 | 07:00-08:45 | L-ERGO | Praktikum Perancangan Teknik Industri | E |
Gunawan Budi Susilo, M.Eng.#198609202019032007 (19860423 201903 1 007) |
| 4 | 07:00-09:40 | FST-102 | Sistem Manajemen Mutu Produk Halal | A |
Ir. Khusna Dwijayanti, ST., M.Eng., Ph.D, ASEAN Eng. (19851212 201903 2 018) |
| 5 | 08:50-09:40 | L-ERGO | Praktikum Statistika | A |
Ir. Titi Sari, S.T., M.Sc., IPM.#199203312019032015 (19911010 201903 2 032) |
| 6 | 08:50-10:35 | FST-306#KAM | Statistika | B |
Tutik Farihah, S.T. M.Sc. (19800706 200501 2 007) |
| 7 | 08:50-10:35 | FST-406 | Perilaku Organisasi | A |
Muhammad Arief Rochman, S.T., M.T. (19820304 200801 1 009) |
| 8 | 08:50-11:30 | FST-306 | Kalkulus II | B |
Aulia Khifah Futhona, M.Sc. (19920605 201903 2 021) |
| 9 | 09:45-10:35 | L-ERGO | Praktikum Statistika | F |
Ir. Titi Sari, S.T., M.Sc., IPM.#199203312019032015 (19911010 201903 2 032) |
| 10 | 09:45-14:15 | FST-102 | Fisika Dasar | G |
Dr. Thaqibul Fikri Niyartama, S.Si., M.Si. (19771025 200501 1 004) |
| 11 | 10:40-11:30 | L-FISDAS | Praktikum Fisika | A |
Andi, M.Sc. (19870210 201903 1 005) |
| 12 | 10:40-13:20 | FST-406 | Pemodelan Sistem | A |
Ir. Dwi Agustina Kurniawati, S.T.,M.Eng.,Ph.D, IPM, ASEAN Eng (19790806 200604 2 001) |
| 13 | 12:30-13:20 | L-KIMDAS1 | Praktikum Kimia | B |
Endaruji Sedyadi, M.Sc. (19820205 201503 1 003) |
| 14 | 12:30-14:15 | L-ERGO | Praktikum Perancangan Teknik Industri | D |
Gunawan Budi Susilo, M.Eng.#198609202019032007 (19860423 201903 1 007) |
| 15 | 12:30-15:10 | FST-306 | Perencanaan dan Pengendalian Produksi | B |
Dr. Ir. Yandra Rahadian Perdana, ST., MT#198512122019032018 (19811025 200912 1 002) |
| 16 | 13:25-15:10 | FST-406 | Data Mining | A |
Muhammad Arief Rochman, S.T., M.T.#199203092020121001 (19820304 200801 1 009) |
| 17 | 14:20-15:10 | L-FISDAS | Praktikum Fisika | D |
Andi, M.Sc. (19870210 201903 1 005) |
| 18 | 15:30-17:15 | FST-306 | Pancasila | B |
Chandra Kartika Dewi, M.Kes.#198609202019032007 (19900421 201903 2 017) |
Hari : Jum'at
| No | Jam | Ruang | Nama Mata Kuliah | Kelas | Dosen Pengampu |
|---|---|---|---|---|---|
| 1 | 07:00-07:50 | L-401 | Praktikum Simulasi Komputer | F |
Ir. Taufiq Aji, S.T. M.T., IPM.#198709152020121004 (19800715 200604 1 002) |
| 2 | 07:00-07:50 | L-FISDAS | Praktikum Fisika | E |
Andi, M.Sc. (19870210 201903 1 005) |
| 3 | 07:00-08:45 | FST-103 | Simulasi Komputer | B |
Ir. Taufiq Aji, S.T. M.T., IPM.#198709152020121004 (19800715 200604 1 002) |
| 4 | 07:00-08:45 | FST-306#JUM | Fisika | B |
Frida Agung Rakhmadi, S.Si., M.Sc.#197710252005011004 (19780510 200501 1 003) |
| 5 | 07:00-08:45 | FST-406 | Ulum Al-Qur'an | B |
Ni'mah Afifah, S.Ag., M.Ag., M.Pd.I. (19740721 000000 2 301) |
| 6 | 07:00-08:45 | L-ERGO | Praktikum Perancangan Teknik Industri | F |
Gunawan Budi Susilo, M.Eng.#198609202019032007 (19860423 201903 1 007) |
| 7 | 08:50-09:40 | L-401 | Praktikum Menggambar Teknik | G |
Gunawan Budi Susilo, M.Eng. (19860423 201903 1 007) |
| 8 | 08:50-09:40 | L-ERGO | Praktikum Statistika | E |
Ir. Titi Sari, S.T., M.Sc., IPM.#199203312019032015 (19911010 201903 2 032) |
| 9 | 08:50-10:35 | FST-103 | Pemodelan Sistem | B |
Ir. Dwi Agustina Kurniawati, S.T.,M.Eng.,Ph.D, IPM, ASEAN Eng (19790806 200604 2 001) |
| 10 | 08:50-10:35 | FST-306 | Ulum Al-Qur'an | A |
Ni'mah Afifah, S.Ag., M.Ag., M.Pd.I. (19740721 000000 2 301) |
| 11 | 08:50-11:30 | FST-406 | Analisis Perancangan Perusahaan | A |
Dr. Ir. Ira Setyaningsih, S.T., M.Sc, IPM, ASEAN Eng. (19790326 200604 2 002) |
| 12 | 09:45-10:35 | L-ERGO | Praktikum Statistika | D |
Ir. Titi Sari, S.T., M.Sc., IPM.#199203312019032015 (19911010 201903 2 032) |
| 13 | 09:45-10:35 | L-KIMDAS1 | Praktikum Kimia | A |
Endaruji Sedyadi, M.Sc. (19820205 201503 1 003) |
| 14 | 09:45-11:30 | L-ERGO | Praktikum Statistika | G |
Herninanjati Paramawardhani, M.Sc. (19920331 201903 2 015) |
| 15 | 13:25-15:10 | FST-103 | Pancasila | A |
Chandra Kartika Dewi, M.Kes.#198609202019032007 (19900421 201903 2 017) |
| 16 | 13:25-15:10 | FST-406 | Data Mining | B |
Muhammad Arief Rochman, S.T., M.T.#199203092020121001 (19820304 200801 1 009) |
| 17 | 13:25-16:20 | FST-306 | Desain dan Ergonomika Produk | A |
Ir. Taufiq Aji, S.T. M.T., IPM. (19800715 200604 1 002) |
Hari : Sabtu
| No | Jam | Ruang | Nama Mata Kuliah | Kelas | Dosen Pengampu |
|---|---|---|---|---|---|
| 1 | 06:00-06:00 | FST-Virtual | Kuliah Kerja Nyata | A |
Herninanjati Paramawardhani, M.Sc. (19920331 201903 2 015) |
| 2 | 06:03-06:03 | FST-Virtual | Tugas Akhir | A |
Gunawan Budi Susilo, M.Eng. (19860423 201903 1 007) |
| 3 | 06:04-06:04 | FST-Virtual | Tugas Akhir | B |
Herninanjati Paramawardhani, M.Sc. (19920331 201903 2 015) |
| 4 | 06:05-06:05 | FST-Virtual | Tugas Akhir | C |
Ir. Dwi Agustina Kurniawati, S.T.,M.Eng.,Ph.D, IPM, ASEAN Eng (19790806 200604 2 001) |
| 5 | 06:06-06:06 | FST-Virtual | Tugas Akhir | D |
Ir. Khusna Dwijayanti, ST., M.Eng., Ph.D, ASEAN Eng. (19851212 201903 2 018) |
| 6 | 06:07-06:07 | FST-Virtual | Tugas Akhir | E |
Dr. Ir. Ira Setyaningsih, S.T., M.Sc, IPM, ASEAN Eng. (19790326 200604 2 002) |
| 7 | 06:08-06:08 | FST-Virtual | Tugas Akhir | F |
Ir. Trio Yonathan Teja Kusuma, S.T., M.T., IPM. (19890715 201503 1 007) |
| 8 | 06:09-06:09 | FST-Virtual | Tugas Akhir | G |
Ir. Taufiq Aji, S.T. M.T., IPM. (19800715 200604 1 002) |
| 9 | 06:10-06:10 | FST-Virtual | Tugas Akhir | H |
Tutik Farihah, S.T. M.Sc. (19800706 200501 2 007) |
| 10 | 06:11-06:11 | FST-Virtual | Tugas Akhir | I |
Dr. Ir. Yandra Rahadian Perdana, ST., MT (19811025 200912 1 002) |
| 11 | 06:12-06:12 | FST-Virtual | Tugas Akhir 1 | A |
Herninanjati Paramawardhani, M.Sc. (19920331 201903 2 015) |
| 12 | 06:13-06:13 | FST-Virtual | Tugas Akhir | J |
Syaeful Arief, S.T., M.T. (19870915 202012 1 004) |
| 13 | 06:16-06:16 | FST-Virtual | Tugas Akhir | K |
Ir. Titi Sari, S.T., M.Sc., IPM. (19911010 201903 2 032) |
| 14 | 06:17-06:17 | FST-Virtual | Tugas Akhir | L |
Ni Kadek Pujiani Dewi, M.ERG. (19860920 201903 2 007) |
| 15 | 06:19-06:19 | FST-Virtual | Tugas Akhir 1 | A |
Gunawan Budi Susilo, M.Eng. (19860423 201903 1 007) |
| 16 | 06:20-06:20 | FST-Virtual | Tugas Akhir | A |
Gunawan Budi Susilo, M.Eng. (19860423 201903 1 007) |
| 17 | 07:00-07:50 | L-ERGO | Praktikum Statistika | G |
Ir. Titi Sari, S.T., M.Sc., IPM.#199203312019032015 (19911010 201903 2 032) |